YDY3 LIFTING AND SUBSTATION, WATER-DISTRIBUTION PIPELINE AND LIFTING LINE ONSTRUCTION PROJECT

Location Adana Hacı Sabancı OSB
Date 2014-2016
Work Scope Project Review and Appraisal, Tender Documentation, Construction Management
Project Features • yDY3 Lifting and Substation Construction • yDY3 Lifting and Substation mechanical equipment, piping, electric and automation works, • Exterior Lighting, Earthing and Electrical Works of yDY3 Lifting and Substation • Procurement of piping materials of DN 1400 diameters steel pipe line: 2,77km. Construction of vacuum lifter and outlet chambers; procurement, transportation, installation, test and implementation of every kind of fitting materials • Procurement of piping materials of DN 1400 diameters steel pipe lifting line: 4,34 km. Construction of vacuum lifter and outlet chambers; procurement, transportation, installation, test and implementation of every kind of fitting materials, • fF/O Line installation between yDY3 Rezervoir and Domestic Water Treatment Plant, • DN 250 HDPE Mud Line: 3,66 km. Connecting line of polyethylene tube mud line to the existing B491 manhole shaft before the existing Waste Water Treatment Plant; procurement, transportation, installation, test and commissioning of piping and every kind of material