Project for the Renovation of MV Electric Distribution Centers and Full Conversion of Aerial Lines to Underground Lines in the Currently Active Part (1225 ha)

Location Adana Hacı Sabancı OSB
Date 2014-2017
Work Scope Project Review and Appraisal, Tender Documentation, Construction Management
Project Features • 4 pcs feeders for each ADM and power supply having 31,5 kV voltage level through TEIAS Substation • 2 pcs ADM, 12 pcs DM and 114 pcs YDM (monoblock transformer substation) installation • 15.000 m duct (cable infrastructure) • 760 pcs electric manholes • 180.000 m XLPE MV cable • 130 pcs adet metal clad cubicles • 12 pcs autoproducer cubicles • 640 pcs metal enclosed cubicles