ADDITIONAL AREA (365 ha) INFRASTRUCTURE CONSTRUCTION PROJECT

Location Adana Hacı Sabancı OSB
Date 2015-2016
Work Scope Project Review and Appraisal, Tender Documentation, Construction Management
Project Features • DN 800 Steel Pipeline 2978 m, • DN 90 – DN 5 00 PE 100 PN 10 Ne twork Lines 14.379 m • DN 300 – DN600 SN 8 corrugated line 13.068 m • DN 355 SDR 11 PN 10 HDPE w astewater lifting line 2.831 m • Wastewater Lifting Centre • 630 m closed outlet • DN 1000 – DN 2000 Reinforced Concrete pipe line 1.013 m • DN 300 – DN 800 HDPE Pipe Line 406m